Alliance for Supportive Housingashdallas.org Give on Sept. 17
Architectural rendering of two sage-green, two-story apartment buildings joined by covered walkways around a shared courtyard

A home of their own, and neighbors who understand.

ASH is building 22 apartments in North Dallas for adults living with serious mental illness. On North Texas Giving Day, Thursday, September 17, your gift moves this community closer to groundbreaking.

Architect's concept rendering. Final design may change.

Housing is not a luxury. It's a lifeline.

For adults with serious mental illness, a safe and affordable place to live can be nearly impossible to find, and isolation often follows.

We are family and community members who have watched people we love struggle to find stable housing and real friendships. Many families carry the same quiet worry: what will happen to my loved one when I'm no longer here to help?

ASH's answer is a Supportive Community model. Residents live independently in their own apartments, with neighbors, programs, and a community space built around connection. Plans include life skills and financial literacy workshops, social events and outings, health and wellness activities, and time for creativity and fun.

Living in a supportive housing community has made such a great difference in my life. My friends living around me, the programs, classes, and fun at the community center. I hope that you would support the building of these communities.
Jeanine Hayes, supportive housing resident

What we're building

ASH already owns the land: a 0.82-acre lot in North Dallas. Our architect's latest plan builds the community in two phases so residents can move in sooner.

22 private apartments Phase 1

  • Two two-story residential buildings with 11 apartments each
  • A shared private courtyard between the buildings
  • Private yards for ground-floor apartments
  • A single front entrance to the residential area for resident safety

The community building Phase 2

  • A community living room and shared kitchen for meals and gatherings
  • A therapy room and an office
  • Shared laundry and storage
  • A front yard for community programs and events, and backyard space for recreation
Floor plan of one apartment showing a sleeping area, kitchenette, and full bathroom

Every apartment is a home. Each studio has its own kitchenette, full bathroom, and closet, so residents live independently with support close by.

Phased site plan: community building at the front of the lot, parking in the middle, and two U-shaped apartment buildings around a courtyard at the back
Phase 1: apartmentsPhase 2: community building
Phased site plan, May 2026

Where the project stands

This is ASH's first building, and it's moving. Here's the path from an empty lot to move-in day.

  1. Land securedASH owns the lot outright, with no purchase cost.
  2. Concept designSite plans and renderings completed with our architect.
  3. Construction estimateFull contractor estimate received in March 2026.
  4. Detailed design and engineeringRefining plans, phasing the build, and completing structural engineering.
  5. Funding the buildDonors, foundations, and public housing programs.
  6. GroundbreakingConstruction of Phase 1 apartments.

What it takes to build

$4.6M

Preliminary contractor estimate to build the full community, or roughly $209,000 per apartment.

We will fund construction through a combination of individual donors, foundations, and public affordable housing programs. Gifts from our community come first, because they pay for the design and engineering work that major funders require before they commit.

Where the money goes

  • Interior finishes, cabinets, and flooring$1,066,500
  • Framing, roof, brick, and windows$988,200
  • Plumbing, HVAC, electrical, and fire safety$923,200
  • General contractor fee$765,000
  • Foundation$390,000
  • Courtyard, landscaping, drainage, and fencing$315,000
  • Site preparation and job-site costs$145,000

Estimate dated March 2026, before value engineering and final structural and soil reports. Appliances and some fixtures are purchased separately. Figures will change as design is finalized.

Give on North Texas Giving Day

$25,000

Our Giving Day goal keeps design and engineering moving so the project is ready for major funding.

North Texas Giving Day is Thursday, September 17, 2026. Every gift of any size counts, and 100% of your donation goes to ASH.

After Giving Day

You can give any time through our website.

Donate online at ashdallas.org

Alliance for Supportive Housing, Inc. is a 501(c)(3) nonprofit. EIN 47-5396701.

Other ways to help

Share your expertise

We're looking for board members and advisors with experience as a commercial architect, real estate attorney, marketing executive, or bank executive, and dedicated community volunteers.

Mail a check

Alliance for Supportive Housing
10455 N. Central Expressway
Suite 109-B #425
Dallas, Texas 75231

Talk with us

Want to learn more, or wondering whether ASH could be a fit for your loved one? Contact Robin Page, Board President.

214-794-3200
info@ashdallas.org