Phase 1
22 private apartments
- Two two-story residential buildings with 11 apartments each
- A shared private courtyard between the buildings
- Private yards for ground-floor apartments
- A single front entrance to the residential area for resident safety

Thank you, North Texas!
Thank you to everyone who gave, shared, and cheered us on during North Texas Giving Day on September 17. ASH is building 22 apartments in North Dallas for adults living with serious mental illness, and your support moves this community closer to groundbreaking.
Architect's concept rendering. Final design may change.
For adults with serious mental illness, a safe and affordable place to live can be nearly impossible to find, and isolation often follows.
We are family and community members who have watched people we love struggle to find stable housing and real friendships. Many families carry the same quiet worry: what will happen to my loved one when I'm no longer here to help?
ASH's answer is a Supportive Community model. Residents live independently in their own apartments, with neighbors, programs, and a community space built around connection. Plans include life skills and financial literacy workshops, social events and outings, health and wellness activities, and time for creativity and fun.
Living in a supportive housing community has made such a great difference in my life. My friends living around me, the programs, classes, and fun at the community center. I hope that you would support the building of these communities.
ASH already owns the land: a 0.82-acre lot in North Dallas. Our architect's latest plan builds the community in two phases so residents can move in sooner.
Phase 1
Phase 2


Brick, wood, and sage-green siding. Covered porches and walkways. Planting beds and a courtyard where neighbors can say hello.






This is ASH's first building, and it's moving. Here's the path from an empty lot to move-in day.
ASH owns the lot outright, with no purchase cost.
Site plans and renderings completed with our architect.
Full contractor estimate received in March 2026.
Refining plans, phasing the build, and completing structural engineering.
Donors, foundations, and public housing programs.
Construction of Phase 1 apartments.
$4.6M
Preliminary contractor estimate to build the full community, or roughly $209,000 per apartment.
We will fund construction through a combination of individual donors, foundations, and public affordable housing programs. Gifts from our community come first, because they pay for the design and engineering work that major funders require before they commit.
Estimate dated March 2026, before value engineering and final structural and soil reports. Appliances and some fixtures are purchased separately. Figures will change as design is finalized.
North Texas Giving Day · September 17, 2026
Every gift, of any size, keeps design and engineering moving so the project is ready for major funding. Thank you for giving, for sharing our story, and for believing that everyone deserves a home of their own.
You can still help. Give any time through our website.
Donate online at ashdallas.orgAlliance for Supportive Housing, Inc. is a 501(c)(3) nonprofit. EIN 47-5396701.
We're looking for board members and advisors with experience as a commercial architect, real estate attorney, marketing executive, or bank executive, and dedicated community volunteers.
Want to learn more, or wondering whether ASH could be a fit for your loved one? Contact Robin Page, Board President.